Construction of 2×10 MVA 33/11 kV substation at Satpur MIDC including civil works, switchgear, transformers and 33 kV incoming line, Nashik Urban Circle. The work includes 11 kV XLPE cable, laid in trench, distribution transformers, 315 kVA and ring main units, with allied works as per the detailed BOQ and technical specifications.

₹3.44 Cr

Tender value (estimate)

₹3,44,00,000

₹3.44 L

EMD value

1% of the estimate

₹5,900

Tender fee

₹5,000 + 18% GST

25 Sep 2026

Submission closes

5:00 pm IST · 17 days left

Timeline

Closes in 17 days · 5:00 pm IST
  1. Published28 Aug 2026
  2. Pre-bid5 Sep 20263:00 pm IST
  3. Today8 Sep 2026
  4. Bid submission closes25 Sep 20265:00 pm IST
  5. Technical bid opening28 Sep 202611:00 am IST
  6. Financial bid openingTo be notified

Documents

Download all
#DocumentSizeTypeUploadedDownload
1Tender notice (NIT)Primary425 KBPDF28 Aug 2026
2Tender document and conditions2 MBPDF28 Aug 2026
3Bill of quantities (BOQ)1.7 MBXLS28 Aug 2026
4Drawings and typical sections3.2 MBPDF28 Aug 2026
5Corrigendum 1128 KBPDF5 Sep 2026

Who can bid?

You don't appear eligible
RegistrationRegistered in the required class with the department, or accepted by reciprocity
What you have
MSEDCL vendor registration, substation works category
Result
Not met
Clause
4.1
Similar workOne similar work of at least ₹1.38 Cr (40% of the estimate) in the last five years
What you have
On file · meets the requirement
Result
Met
Clause
4.5
TurnoverAverage annual turnover of at least ₹1.72 Cr (50% of the estimate) over the last three years
What you have
On file · meets the requirement
Result
Met
Clause
4.4
Bid capacityBid capacity above ₹3.44 Cr after the works in hand
What you have
MSEDCL vendor registration, substation works category
Result
Not met
Clause
4.6

Documents required

6 on file, 7 to arrange, 1 to sign

Do these first14 documents required

  • Bank solvency certificate, not older than one yearClause 4.7To arrange
  • Plant and machinery list with ownership or lease proofClause 4.8To arrange
  • Key personnel CVs and undertakingsClause 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarisedClause 4.12To sign
  • Declaration of site visit and acceptance of tender conditionsClause 4.13To arrange
  • EPF and ESIC registrationClause 4.3To arrange
  • Works in hand statementClause 4.10To arrange
  • Tender fee and EMD payment receiptsClause 4.17To arrange
  • Registration certificate in the required class, with the departmentClause 4.1On file
  • PAN cardClause 4.2On file
  • GST registration certificateClause 4.2On file
  • Similar work completion certificates, with the client's letterClause 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certifiedClause 4.4On file
  • Bid capacity statement (A × N × 2 − B)Clause 4.6On file

Technical envelope · Cover 1The financial cover is your price alone — the BOQ or price bid, uploaded separately. Never put a price in the technical cover.

EMD and fees

EMD amount
₹3.44 L1% of the estimate
EMD exemption allowed
No
Tender fee
₹5,000 + 18% GST (₹5,900)
Tender fee exemption allowed
No
Payment mode
Online (mahatenders)
Refund policy
As per tender document

Work to be done

Construction of 2×10 MVA 33/11 kV substation at Satpur MIDC including civil works, switchgear, transformers and 33 kV incoming line

Site
Nashik district, Maharashtra
Duration
12 months from the work order
How you quote
One percentage above or below the estimate, applied to all items.

Main items

SampleFrom the BOQ · 8 items
ItemQuantityShare of value
11 kV XLPE cable, laid in trench6,190 m
Street-light poles with LED luminaires205 nos
Distribution transformers, 315 kVA4 nos
Ring main units3 nos
Cable trenching, ducts and backfilling5,160 m
LT distribution panels
10 nos
Earthing sets with pits
83 nos
Testing and commissioning
1 LS

Market intel

Past result for similar workA different tender

MSEDCL/NSK-U/2025-26/T-98 · Won by Marathwada Electricals · L1 2.9% below its estimate · 5 bidders · Awarded 5 Mar 2026

RankBidderQuote on this estimatevs estimate
L1Marathwada Electricals₹3.34 Cr-2.9%
L2Bidder 2₹3.39 Cr-1.4%
L3Bidder 3₹3.43 Cr-0.4%
L4Bidder 4₹3.46 Cr+0.6%
L5Bidder 5₹3.49 Cr+1.5%

Quotes are that tender's percentages applied to this tender's estimate.

33/11 kV substation, Satpur MIDCMSEDCL/NSK-U/2026-27/T-142 · MSEDCL
Closes in 17 days25 Sep 2026, 5:00 pm IST

Sign in to set a reminder

We'll send a one-time code on WhatsApp.

Preview · accounts are not live yet

Full analysis

MSEDCL/NSK-U/2026-27/T-142 · generated from the tender documents

Summary

This tender involves construction of 2×10 MVA 33/11 kV substation at Satpur MIDC including civil works, switchgear, transformers and 33 kV incoming line, Nashik Urban Circle. Estimated value is ₹3.44 Cr with ₹3.44 L EMD. Submission closes on 25 Sep 2026. You don't appear eligible: mSEDCL vendor registration, substation works category.

Eligibility

  • Registration — Registered in the required class with the department, or accepted by reciprocity · Clause 4.1
  • Similar work — One similar work of at least ₹1.38 Cr (40% of the estimate) in the last five years · Clause 4.5
  • Turnover — Average annual turnover of at least ₹1.72 Cr (50% of the estimate) over the last three years · Clause 4.4
  • Bid capacity — Bid capacity above ₹3.44 Cr after the works in hand · Clause 4.6

Documents to submit

  • Registration certificate in the required class, with the department · 4.1On file
  • PAN card · 4.2On file
  • GST registration certificate · 4.2On file
  • Similar work completion certificates, with the client's letter · 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certified · 4.4On file
  • Bid capacity statement (A × N × 2 − B) · 4.6On file
  • Bank solvency certificate, not older than one year · 4.7To arrange
  • Plant and machinery list with ownership or lease proof · 4.8To arrange
  • Key personnel CVs and undertakings · 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarised · 4.12To sign
  • Declaration of site visit and acceptance of tender conditions · 4.13To arrange
  • EPF and ESIC registration · 4.3To arrange
  • Works in hand statement · 4.10To arrange
  • Tender fee and EMD payment receipts · 4.17To arrange

Clauses worth checking

  • Type-tested equipment only Transformers and switchgear must be from MSEDCL-approved makes with type-test reports under five years old. · Clause 11.3 · p. 29
Bid validity
120 days
Performance security
5% of the contract value
Additional security
If the quote is more than 10% below the estimate
Retention
5%, released after defect liability
Defect liability
12 months from completion
Completion
12 months from the work order

Bill of quantities

ItemUnitQuantity
11 kV XLPE cable, laid in trenchm6,190
Distribution transformers, 315 kVAnos4
Ring main unitsnos3
LT distribution panelsnos10
Street-light poles with LED luminairesnos205
Earthing sets with pitsnos83
Cable trenching, ducts and backfillingm5,160
Testing and commissioningLS1

Bill of quantities (BOQ) Sample

BOQ_MSEDCL-NSK-U-2026-27-T-142.xls · 1 worksheet

Download BOQ (XLS)1.7 MB
Sl. No.Item descriptionUnitQuantity
111 kV XLPE cable, laid in trenchm6,190
2Distribution transformers, 315 kVAnos4
3Ring main unitsnos3
4LT distribution panelsnos10
5Street-light poles with LED luminairesnos205
6Earthing sets with pitsnos83
7Cable trenching, ducts and backfillingm5,160
8Testing and commissioningLS1