Widening to two lanes with paved shoulders and strengthening of Pune–Saswad road (SH-64) from km 12.00 to km 19.40, Taluka Purandar, District Pune. The work includes earthwork in embankment and shoulders, granular sub-base (GSB), grading II and wet mix macadam (WMM), with allied works as per the detailed BOQ and technical specifications.

₹4.86 Cr

Tender value (estimate)

₹4,86,00,000

₹4.86 L

EMD value

1% of the estimate

₹5,900

Tender fee

₹5,000 + 18% GST

9 Oct 2026

Submission closes

5:00 pm IST · 31 days left

Timeline

Closes in 31 days · 5:00 pm IST
  1. Published7 Sep 2026
  2. Today8 Sep 2026
  3. Pre-bid16 Sep 202611:00 am IST
  4. Bid submission closes9 Oct 20265:00 pm IST
  5. Technical bid opening12 Oct 202611:00 am IST
  6. Financial bid openingTo be notified

Documents

Download all
#DocumentSizeTypeUploadedDownload
1Tender notice (NIT)Primary430 KBPDF7 Sep 2026
2Tender document and conditions2.7 MBPDF7 Sep 2026
3Bill of quantities (BOQ)2.1 MBXLS7 Sep 2026
4Drawings and typical sections4 MBPDF7 Sep 2026

Who can bid?

Check needed
RegistrationRegistered in the required class with the department, or accepted by reciprocity
What you have
On file · meets the requirement
Result
Met
Clause
4.1
Similar workOne similar work of at least ₹1.94 Cr (40% of the estimate) in the last five years
What you have
Paved-shoulder work must appear in the qualifying certificate; your Nashik strengthening job is plain resurfacing — attach a letter from the EE or pick another job.
Result
Check needed
Clause
4.5
TurnoverAverage annual turnover of at least ₹2.43 Cr (50% of the estimate) over the last three years
What you have
On file · meets the requirement
Result
Met
Clause
4.4
Bid capacityBid capacity above ₹4.86 Cr after the works in hand
What you have
On file · meets the requirement
Result
Met
Clause
4.6

Documents required

10 on file, 3 to arrange, 1 to sign

Do these first14 documents required

  • Bank solvency certificate, not older than one yearClause 4.7To arrange
  • Plant and machinery list with ownership or lease proofClause 4.8To arrange
  • Key personnel CVs and undertakingsClause 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarisedClause 4.12To sign
  • Registration certificate in the required class, with the departmentClause 4.1On file
  • PAN cardClause 4.2On file
  • GST registration certificateClause 4.2On file
  • Similar work completion certificates, with the client's letterClause 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certifiedClause 4.4On file
  • Bid capacity statement (A × N × 2 − B)Clause 4.6On file
  • Declaration of site visit and acceptance of tender conditionsClause 4.13On file
  • EPF and ESIC registrationClause 4.3On file
  • Works in hand statementClause 4.10On file
  • Tender fee and EMD payment receiptsClause 4.17On file

Technical envelope · Cover 1The financial cover is your price alone — the BOQ or price bid, uploaded separately. Never put a price in the technical cover.

EMD and fees

EMD amount
₹4.86 L1% of the estimate
EMD exemption allowed
No
Tender fee
₹5,000 + 18% GST (₹5,900)
Tender fee exemption allowed
No
Payment mode
Online (mahatenders)
Refund policy
As per tender document

Work to be done

Widening to two lanes with paved shoulders and strengthening of Pune–Saswad road (SH-64) from km 12.00 to km 19.40 (7.4 km), Taluka Purandar

Site
Pune district, Maharashtra
Duration
12 months from the work order, including monsoon
How you quote
One percentage above or below the estimate, applied to all items.

Main items

SampleFrom the BOQ · 8 items
ItemQuantityShare of value
Bituminous concrete (BC), 30 mm3,130 cum
Dense bituminous macadam (DBM), 50 mm5,200 cum
Wet mix macadam (WMM)10,690 cum
Granular sub-base (GSB), grading II13,410 cum
RCC pipe culverts, 900 mm dia, with headwalls13 nos
Earthwork in embankment and shoulders
8,940 cum
Prime coat and tack coat
1,04,250 sqm
Road markings, signage and km stones
1 LS

Market intel

Past result for similar workA different tender

PWD/PUN/2025-26/0461 · Won by Omkar Constructions Pune · L1 9.8% below its estimate · 11 bidders · Awarded 24 Mar 2026

RankBidderQuote on this estimatevs estimate
L1Omkar Constructions Pune₹4.38 Cr-9.8%
L2Bidder 2₹4.48 Cr-7.9%
L3Bidder 3₹4.55 Cr-6.4%
L4Bidder 4₹4.61 Cr-5.1%
L5Bidder 5₹4.67 Cr-3.9%
Show all 9 bidders
L6Bidder 6₹4.72 Cr-2.8%
L7Bidder 7₹4.78 Cr-1.7%
L8Bidder 8₹4.83 Cr-0.6%
L9Bidder 9₹4.88 Cr+0.4%

Quotes are that tender's percentages applied to this tender's estimate.

Pune–Saswad road widening, km 12–19PWD/PUN/2026-27/0538 · PWD Maharashtra
Closes in 31 days9 Oct 2026, 5:00 pm IST

Sign in to set a reminder

We'll send a one-time code on WhatsApp.

Preview · accounts are not live yet

Full analysis

PWD/PUN/2026-27/0538 · generated from the tender documents

Summary

This tender involves widening to two lanes with paved shoulders and strengthening of Pune–Saswad road (SH-64) from km 12.00 to km 19.40, Taluka Purandar, District Pune. Estimated value is ₹4.86 Cr with ₹4.86 L EMD. Submission closes on 9 Oct 2026. One criterion needs a check: paved-shoulder work must appear in the qualifying certificate; your Nashik strengthening job is plain resurfacing — attach a letter from the EE or pick another job.

Eligibility

  • Registration — Registered in the required class with the department, or accepted by reciprocity · Clause 4.1
  • Similar work — One similar work of at least ₹1.94 Cr (40% of the estimate) in the last five years · Clause 4.5
  • Turnover — Average annual turnover of at least ₹2.43 Cr (50% of the estimate) over the last three years · Clause 4.4
  • Bid capacity — Bid capacity above ₹4.86 Cr after the works in hand · Clause 4.6

Documents to submit

  • Registration certificate in the required class, with the department · 4.1On file
  • PAN card · 4.2On file
  • GST registration certificate · 4.2On file
  • Similar work completion certificates, with the client's letter · 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certified · 4.4On file
  • Bid capacity statement (A × N × 2 − B) · 4.6On file
  • Bank solvency certificate, not older than one year · 4.7To arrange
  • Plant and machinery list with ownership or lease proof · 4.8To arrange
  • Key personnel CVs and undertakings · 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarised · 4.12To sign
  • Declaration of site visit and acceptance of tender conditions · 4.13On file
  • EPF and ESIC registration · 4.3On file
  • Works in hand statement · 4.10On file
  • Tender fee and EMD payment receipts · 4.17On file

Clauses worth checking

  • Utility shifting is yours to coordinate Water lines and MSEDCL poles along km 14–17 are shifted by the utilities on your request; the programme does not stop while you wait. · Clause 8.4 · p. 21
  • Price variation only on bitumen Star-rate adjustment applies to bitumen alone; cement, steel and labour are fixed for the 18-month period. · Clause 31.2 · p. 88
Bid validity
120 days
Performance security
5% of the contract value
Additional security
If the quote is more than 10% below the estimate
Retention
5%, released after defect liability
Defect liability
12 months from completion
Completion
12 months from the work order, including monsoon

Bill of quantities

ItemUnitQuantity
Earthwork in embankment and shoulderscum8,940
Granular sub-base (GSB), grading IIcum13,410
Wet mix macadam (WMM)cum10,690
Prime coat and tack coatsqm1,04,250
Dense bituminous macadam (DBM), 50 mmcum5,200
Bituminous concrete (BC), 30 mmcum3,130
RCC pipe culverts, 900 mm dia, with headwallsnos13
Road markings, signage and km stonesLS1

Bill of quantities (BOQ) Sample

BOQ_PWD-PUN-2026-27-0538.xls · 1 worksheet

Download BOQ (XLS)2.1 MB
Sl. No.Item descriptionUnitQuantity
1Earthwork in embankment and shoulderscum8,940
2Granular sub-base (GSB), grading IIcum13,410
3Wet mix macadam (WMM)cum10,690
4Prime coat and tack coatsqm1,04,250
5Dense bituminous macadam (DBM), 50 mmcum5,200
6Bituminous concrete (BC), 30 mmcum3,130
7RCC pipe culverts, 900 mm dia, with headwallsnos13
8Road markings, signage and km stonesLS1