Tender HawkSign in
Needs a check3 of 4 mandatory criteria met
Published 21 Aug 2026 on mahatenders

Baramati augmentation, pipelines and ESRs

Maharashtra Jeevan Pradhikaran · Pune Circle · Pune, Maharashtra · Water supply & sanitation

  • Civil works
  • Water supply & sanitation
  • Water supply
  • MH

Providing and laying 300 mm and 200 mm DI K-7 distribution network (38 km) and constructing three elevated service reservoirs for Baramati augmentation scheme, District Pune. The work includes dI K7 pipe, 200 mm, supplied and laid, hDPE pipe, 110 mm, supplied and laid and trenching and backfilling, with allied works as per the detailed BOQ and technical specifications.

₹9.4 Cr

Tender value (estimate)

₹9,40,00,000

₹9.4 L

EMD value

1% of the estimate

₹11,800

Tender fee

₹10,000 + 18% GST

29 Sep 2026

Submission closes

3:00 pm IST · 21 days left

Timeline

Closes in 21 days · 3:00 pm IST
  1. Published21 Aug 2026
  2. Pre-bid1 Sep 202611:30 am IST
  3. Today8 Sep 2026
  4. Bid submission closes29 Sep 20263:00 pm IST
  5. Technical bid opening30 Sep 202611:00 am IST
  6. Financial bid openingTo be notified

Documents

Download all
#DocumentSizeTypeUploadedDownload
1Tender notice (NIT)Primary486 KBPDF21 Aug 2026
2Tender document and conditions1.8 MBPDF21 Aug 2026
3Bill of quantities (BOQ)2.2 MBXLS21 Aug 2026
4Drawings and typical sections5.3 MBPDF21 Aug 2026
5Corrigendum 1105 KBPDF8 Sep 2026

Who can bid?

Check needed
RegistrationRegistered in the required class with the department, or accepted by reciprocity
What you have
On file · meets the requirement
Result
Met
Clause
4.1
Similar workOne similar work of at least ₹3.76 Cr (40% of the estimate) in the last five years
What you have
One DI or MS pipeline work of 200 mm or more worth ₹3.76 Cr, or two of ₹2.35 Cr each
Result
Check needed
Clause
4.5
TurnoverAverage annual turnover of at least ₹4.7 Cr (50% of the estimate) over the last three years
What you have
On file · meets the requirement
Result
Met
Clause
4.4
Bid capacityBid capacity above ₹9.4 Cr after the works in hand
What you have
On file · meets the requirement
Result
Met
Clause
4.6

Documents required

9 on file, 5 to arrange, 2 to sign

Do these first16 documents required

  • Bank solvency certificate, not older than one yearClause 4.7To arrange
  • Plant and machinery list with ownership or lease proofClause 4.8To arrange
  • Key personnel CVs and undertakingsClause 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarisedClause 4.12To sign
  • Declaration of site visit and acceptance of tender conditionsClause 4.13To sign
  • Integrity pact, signed on stamp paperClause 4.14To arrange
  • Power of attorney for the signatoryClause 4.15To arrange
  • Registration certificate in the required class, with the departmentClause 4.1On file
  • PAN cardClause 4.2On file
  • GST registration certificateClause 4.2On file
  • Similar work completion certificates, with the client's letterClause 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certifiedClause 4.4On file
  • Bid capacity statement (A × N × 2 − B)Clause 4.6On file
  • EPF and ESIC registrationClause 4.3On file
  • Works in hand statementClause 4.10On file
  • Tender fee and EMD payment receiptsClause 4.17On file

Technical envelope · Cover 1The financial cover is your price alone — the BOQ or price bid, uploaded separately. Never put a price in the technical cover.

EMD and fees

EMD amount
₹9.4 L1% of the estimate
EMD exemption allowed
No
Tender fee
₹10,000 + 18% GST (₹11,800)
Tender fee exemption allowed
No
Payment mode
Online (mahatenders)
Refund policy
As per tender document

Work to be done

Providing and laying 300 mm and 200 mm DI K-7 distribution network (38 km) and constructing three elevated service reservoirs for Baramati augmentation scheme

Site
Pune district, Maharashtra
Duration
18 months from the work order, including monsoon
How you quote
One percentage above or below the estimate, applied to all items.

Main items

SampleFrom the BOQ · 8 items
ItemQuantityShare of value
DI K7 pipe, 200 mm, supplied and laid11,280 m
Elevated service reservoir, RCC565 cum
HDPE pipe, 110 mm, supplied and laid22,560 m
Trenching and backfilling26,320 cum
Pumping machinery, supplied and installed6 sets
House service connections
2,820 nos
Sluice valves with chambers
75 nos
Testing, disinfection and commissioning
1 LS

Market intel

Past result for similar workA different tender

MJP/PUN/WSS/2025-26/77 · Won by Konkan Pipelines & Projects · L1 4.6% below its estimate · 6 bidders · Awarded 14 May 2026

RankBidderQuote on this estimatevs estimate
L1Konkan Pipelines & Projects₹8.97 Cr-4.6%
L2Bidder 2₹9.13 Cr-2.9%
L3Bidder 3₹9.24 Cr-1.7%
L4Bidder 4₹9.35 Cr-0.5%
L5Bidder 5₹9.45 Cr+0.5%
Show all 6 bidders
L6Bidder 6₹9.54 Cr+1.5%

Quotes are that tender's percentages applied to this tender's estimate.

Baramati augmentation, pipelines and ESRsMJP/PUN/WSS/2026-27/102 · Maharashtra Jeevan Pradhikaran
Closes in 21 days29 Sep 2026, 3:00 pm IST

Sign in to set a reminder

We'll send a one-time code on WhatsApp.

Preview · accounts are not live yet

Full analysis

MJP/PUN/WSS/2026-27/102 · generated from the tender documents

Summary

This tender involves providing and laying 300 mm and 200 mm DI K-7 distribution network (38 km) and constructing three elevated service reservoirs for Baramati augmentation scheme, District Pune. Estimated value is ₹9.4 Cr with ₹9.4 L EMD. Submission closes on 29 Sep 2026. One criterion needs a check: one DI or MS pipeline work of 200 mm or more worth ₹3.76 Cr, or two of ₹2.35 Cr each.

Eligibility

  • Registration — Registered in the required class with the department, or accepted by reciprocity · Clause 4.1
  • Similar work — One similar work of at least ₹3.76 Cr (40% of the estimate) in the last five years · Clause 4.5
  • Turnover — Average annual turnover of at least ₹4.7 Cr (50% of the estimate) over the last three years · Clause 4.4
  • Bid capacity — Bid capacity above ₹9.4 Cr after the works in hand · Clause 4.6

Documents to submit

  • Registration certificate in the required class, with the department · 4.1On file
  • PAN card · 4.2On file
  • GST registration certificate · 4.2On file
  • Similar work completion certificates, with the client's letter · 4.5On file
  • Audited balance sheets and turnover certificate, last three years, CA-certified · 4.4On file
  • Bid capacity statement (A × N × 2 − B) · 4.6On file
  • Bank solvency certificate, not older than one year · 4.7To arrange
  • Plant and machinery list with ownership or lease proof · 4.8To arrange
  • Key personnel CVs and undertakings · 4.9To arrange
  • Affidavit of no blacklisting and no pending litigation, notarised · 4.12To sign
  • Declaration of site visit and acceptance of tender conditions · 4.13To sign
  • EPF and ESIC registration · 4.3On file
  • Works in hand statement · 4.10On file
  • Tender fee and EMD payment receipts · 4.17On file
  • Integrity pact, signed on stamp paper · 4.14To arrange
  • Power of attorney for the signatory · 4.15To arrange

Clauses worth checking

  • Ten-year O&M bundled O&M for ten years after commissioning is quoted separately in Schedule C but is part of the same contract and its security. · Clause 3.2 · p. 9
Bid validity
120 days
Performance security
5% of the contract value
Additional security
If the quote is more than 10% below the estimate
Retention
5%, released after defect liability
Defect liability
12 months from completion
Completion
18 months from the work order, including monsoon

Bill of quantities

ItemUnitQuantity
DI K7 pipe, 200 mm, supplied and laidm11,280
HDPE pipe, 110 mm, supplied and laidm22,560
Trenching and backfillingcum26,320
Sluice valves with chambersnos75
Elevated service reservoir, RCCcum565
Pumping machinery, supplied and installedsets6
House service connectionsnos2,820
Testing, disinfection and commissioningLS1

Bill of quantities (BOQ) Sample

BOQ_MJP-PUN-WSS-2026-27-102.xls · 1 worksheet

Download BOQ (XLS)2.2 MB
Sl. No.Item descriptionUnitQuantity
1DI K7 pipe, 200 mm, supplied and laidm11,280
2HDPE pipe, 110 mm, supplied and laidm22,560
3Trenching and backfillingcum26,320
4Sluice valves with chambersnos75
5Elevated service reservoir, RCCcum565
6Pumping machinery, supplied and installedsets6
7House service connectionsnos2,820
8Testing, disinfection and commissioningLS1